• A.Hak Drillcon
  • A.Hak Drillcon
  • A.Hak Drillcon
  • A.Hak Drillcon

Dynamic Infrastructure

A.Hak Drillcon BV is a dynamic company specializing in the design and implementation of steerable and non-steerable drilling for underground infrastructure.

  • news

    First half landfall completed First half landfall completed

    First half landfall completed

    While the Netherlands was celebrating King's Day, it was also a joyful day at our project location in Israel. The first half of a Direct-Pipe drilling for the landfall of a gas pipeline was successfully completed.

  • news

    Drilling in Amsterdam Drilling in Amsterdam

    Drilling in Amsterdam

    In Amsterdam, A.Hak Drillcon has completed the first pull-in of the 16 HDD’s it is carrying out for Nuon Noorderwarmte (District Heating).

  • news

    District heating HVC Alkmaar District heating HVC Alkmaar

    District heating HVC Alkmaar

    The A.Hak companies work on many different locations to build district heating infrastructure. At this location Alkmaar, the Netherlands, the local news network joined us.

  • projects

    Gasunie Direct-Pipe 1400 m world record Gasunie Direct-Pipe 1400 m world record

    Gasunie Direct-Pipe 1400 m world record

    In spring 2011, A. Hak Drillcon B.V. performed in co-operation with A. Hak Leidingbouw B.V. a Direct Pipe drilling in Lochem, The Netherlands. The length of the total drill line was 1,400 m!