• news

    Congratulations on a safe and sustainable landfall Congratulations on a safe and sustainable landfall

    Congratulations on a safe and sustainable landfall

    A.Hak completed a 1,100 meter long 56” Direct Pipe landfall drilling at the Israeli coast. Without safety issues, on schedule and with a satisfied client.

  • projects

    Gasunie Direct-Pipe 1400 m world record Gasunie Direct-Pipe 1400 m world record

    Gasunie Direct-Pipe 1400 m world record

    In spring 2011, A. Hak Drillcon B.V. performed in co-operation with A. Hak Leidingbouw B.V. a Direct Pipe drilling in Lochem, The Netherlands. The length of the total drill line was 1,400 m!

  • news

    River crossings TAP River crossings TAP

    River crossings TAP

    A.Hak is proud of its own equipment that is used in the construction of underground infrastructure all over the world. Our machines demand a leading role on film material from the TAP project.

  • news

    Successful drilling Alkmaar Heat Network Successful drilling Alkmaar Heat Network

    Successful drilling Alkmaar Heat Network

    As part of the construction of the Alkmaar Heat Network, A.Hak performed a successful drilling under the Westtangent in Heerhugowaard on Tuesday, April 17th.